
Welding at the Mañanitas shop
Mantra Global Corp
A Panamanian company building steel structures and lightweight systems, with its own fabrication shop in Mañanitas.
Vision
We want to be the steel structures and lightweight systems company a client trusts to get the work done right, on time and without surprises. That is why we work in order: every project is planned before it starts, every piece we fabricate is checked in our shop before it leaves, and on site everything is verified before it is erected. We put excellence above all, we meet the deadlines we agree to, and we say things as they are. That is how we want to grow in Panama: project by project, with clients who come back to work with us.
Our values
Seven verbs that define how we work.
Work as a team
No one wins alone.
We share information and ask for help in time. The success of the project matters more than anyone's personal credit.
Persevere
An obstacle does not stop us.
If something fails, we look for another way to solve it until we finish what we started.
Act with integrity
We tell the truth even when it does not suit us.
We do not deceive the client, the supplier or a colleague, and we do the right thing even when no one is watching.
Commit
What we promise, we deliver.
That is why we only promise what we can deliver: realistic schedules, sustainable prices and clear scopes.
Take responsibility
We face up to it when something goes wrong.
We do not look for someone to blame. We look for the cause, correct it and make sure it does not happen again.
Be consistent
What we say, what we write, what we quote and what we build has to match.
Our word is worth the same in the letter, on site and on the invoice.
Pursue excellence
We do things right the first time.
We verify instead of assuming, and we measure twice before cutting. We also deliver more than the minimum, whenever it adds real value for the client.
The Mañanitas shop
Our shop in Mañanitas is where we cut, fit, weld and paint the steel for the structures we fabricate.



Track record
Delivered work and company milestones, year by year.
2022
Steel structure for the bridge between the towers of the Hyde project in San Francisco.
View project: Puente Hyde
2024
Engineering, fabrication and erection of the steel structures at Yappy Park, the Porta Norte sports complex.
View project: Yappy Park · Porta Norte
2025
Joined the Panamanian Chamber of Construction (CAPAC) in March.
Fabrication and erection of the white-finished steel structure at Villa Lampedusa, Ocean Reef Islands.
View project: Villa Lampedusa
2026
In January, handover of the steel structure, slabs and roof for the La Parmigiana plant expansion in Santiago de Veraguas.
View project: La ParmigianaIn June, handover of the steel structure we erected at CAF Hub Norte in Obarrio.
View project: Edificio CAF Región Norte
Our team's earlier work
Before Mantra Global Corp was formed, members of our team worked for other companies on the planning, design or erection of these buildings. They are not Mantra Global Corp projects.
- Multiplaza
- Torres de las Américas
- Torre F&F
- Torre Morgan & Morgan
- Westland Mall
- Megamall
- Panama Metro Lines 1 and 2
- SoHo Mall
- Gimnasio Nueva Sede IJA
- Terminal 2 del AIT
- Parque Industrial Zona 1
- Centro de Convenciones de Amador
- ITSE
- Terminal de Cruceros del Pacífico
Request a quote
Share drawings, calculations or specifications for your project.
ventas01@mantraglb.com · +507 6878-0844